they use natural clay for our high rating

  
WASHINGTON Currently, Purple Bamboo Park lake infiltration reduction projects underway, will bring more than 20,000 square meters of clay layers in the eastern Great Lakes lake. Tourists and environmentalists have questioned that this will affect the water covering the ground, and should be publicized EIA. Zoo,mulberry sale, said reducing water infiltration is to reduce operating and maintenance costs of water parks, impermeable layer does not affect the environment.

Let Weidang lake was drained lake

Yesterday, the Purple Bamboo Park in the Great Lakes for a long period of being fenced enclosure, which many tourists do not know what to do, have to wait and see to the inside through the cracks. A piece of the eastern Great Lakes are separated by a cofferdam, the water has drained, exposing the dark brown of the lake,http://810813.com/home.php?mod=space&uid=230951, it is muddy.

A deep lake from the shore slope, an excavator along the slopes open into the lake, will be shipped to shovel into the clay, the other side of the enclosure, water waves, boat across from time to time.

On a Weidang, Purple Bamboo Park posted "notice" that in order to conserve water, parks in October this year to January next year on the east side of the Great Lakes leakage governance,air max pas cher, in the meantime need to be local surrounding the lake block.

20,000 square meters of clay lake Shop

It is understood that the construction of the eastern Great Lakes to the laying of the first 20,000 square meters of clay layers were cofferdam, drainage and then after several days to dry,hogan outlet, compacted mechanically hardened lake silt, clay and then transported to the lake booth Shop, then rolling to reach the water effects, the final removal of the cofferdam, on Great Lakes water. The whole project is expected to be completed by the end of January 2012.

Purple Bamboo Park relevant responsible person said, throughout the Great Lakes have more than 80,000 square meters, 20,000 square meters of just laying the clay layer in the eastern Great Lakes,https://www.jnjvisioncare.co.uk/index.php?item/create_form/1, there are more than 60,000 square meters in the west is not in the scope of laying, when construction depends The effect of the construction.

Environmentalists question the destruction of the environment

Shop for impervious layer in the bottom of the lake park, tourists and environmentalists have raised the question that lay at the bottom of the lake will affect groundwater covering clay layer may have a negative impact on the environment.

Purple Bamboo Park, said the Great Lakes Purple Bamboo has long needed water from urban rivers and lakes, water shortage and the Lake District's own lake water leakage is the main reason. The lake infiltration reduction project is limited to the effective protection of water resources, reduce leakage, the need to protect landscape water park and boat service water.

According Purple Bamboo Park revealed that this project has been the center of Beijing park management approval and obtain construction funds from the center. For specific amount of funding, Purple Bamboo Park did not respond.

■ Links

Purple Bamboo Park relevant responsible person said, the lake infiltration reduction projects, using a natural clay material that can reduce operational and maintenance costs of water parks, basically no adverse effects on the surrounding environment and water, do not even need to install water treatment systems.

Reporters learned that, after the Yuanmingyuan Park lake impermeable membrane,http://www.wuko.cc/home.php?mod=space&uid=66682,nike tn pas cher, using plastic film,christian louboutin paris, also known as geomembrane, is a kind of polymer as the basic raw material waterproof barrier materials, in the natural environment degrades longer.

■ dialogue

Engineering fee diversion fee? Can not be revealed

Beijing News: Are clay lake bed after the EIA and the publicity?

Purple Bamboo Park: no EIA, but the experts will be held, attended by the relevant experts of China Water Conservancy Academy of impervious areas, they use natural clay for our high rating, we have recorded demonstration at the archive.

Beijing News: Shop clay layer, will block the penetration of water into the ground, groundwater recharge can not be obtained?

Purple Bamboo Park: just laying clay layer thicker soil, reducing water infiltration into the ground, and did not completely isolated.

Beijing News: the laying of the clay layer can reduce how much water?

Purple Bamboo Park: The annual climate is different, not the same amount of water evaporation is not an accurate statistics of how much water after the laying of the clay layer can be less.

Beijing News: Park each year how much money to spend introduction of water,basket nike tn pas cher? Laying clay cost that much?

Purple Bamboo Park: This year the weather is hot, the water evaporation,escarpin louboutin pas cher, the cost will be more. The cost of laying clay and water costs can not be disclosed, but the formalities complete.

■ questioned

Whether through EIA publicity?

Environmental organizations Beagle Club researcher Shao Wenjie said the Purple Bamboo Park Lake belongs to the river River, and the river is a river in Beijing is quite important. Whether from the perspective of respect for nature, or respect for historical perspective on environmental impact assessment for this project should be publicized. Invite experts aquatic ecosystems, traditional cultural experts, environmental NGOs, public representatives together to discuss. Even if you really want to start, it should fully consider various views and then begin construction.

Response: The park is also very careful in this project,air max pas cher, before the project launched specially convened an expert assessment, inviting experts seepage aspects of China Institute of Water Conservancy,http://www.icewen.net/zhidao/question.php?qid=170816,hogan outlet, from a professional point of view on the project they were assessed.

In the review meeting, the experts do to reduce our use of natural clay nitrided layer strongly agree, and passed the assessment of this project.

Complement affect groundwater?

Environmentalists say, before the water can freely infiltration into the ground,http://www.haokc.com/space/space.php?uid=844079&do=blog&id=1352629, groundwater is a supplement, now impervious, had hardened Beijing land is very powerful,http://home.mcyua.org/?action-viewcomment-type-news-itemid-312, infiltration is limited. Recharge groundwater and maintain the landscape water, which is important? Whether the project would have been very few urban congestion and groundwater systems can communicate with the channel?

Response: The project is not in the lake impermeable membrane, completely prevent water infiltration,chaussures louboutin soldes, the laying of the clay layer, in fact, clay is not completely impermeable, but reduce leakage, will not have a negative impact on the environment, there was no obstruction the problem of the channel.

Is causing environmental damage?

Environmentalists worry that the park lake called infiltration reduction project will not cause damage to the environment, but in the deployment of the lake, dry process is certainly a part of the biological damage, destruction of aquatic ecosystems, this will certainly require a period of recovery. The natural clay material used in the lake reduced infiltration engineering, environmental effects whether the assessment?

Response: The project fully consider the impact of the use of the lake laying materials on the environment. The reason infiltration reduction projects using natural clay,http://www.dsws.cn/web/?action-viewcomment-type-news-itemid-1, because clay composition and silt near the lake, so the infiltration reduction projects laying clay,louboutin pas cher,http://www.tdzx.net/bbs/thread-564276-1-1.html, mud lake is only equivalent to thicken, and will not impact on the environment.

Edition written / reporter Rao Pei edition photography / reporter Xue,hogan outlet milano?